Tuesday, March 10, 2015

I took a break from Wondas bathroom remodel to finish a job I started ~ 3 weeks ago.
repaired garage door for car- adjusted side garage door- notched panel next to toilet so tank top would fit- repaired toilet leak- cut interior door down to size. installed door/stops/knob and made custom trim to match existing.

pictures

 

No comments:

Post a Comment