Saturday, March 14, 2015

Friday- Bathroom-installed drywall behind toilet applied 1 coat mud-made access panel for above toilet and installed- removed medicine cabinet, light fixture, drywall, and obsolete vent from bathroom wall so I could center cabinet and light above pedestal sink in bathroom-reinstalled electric gang box for light,drywall, applied 2 coats of mud, temporarily installed light fixture.
Kitchen- removed refrigerator, stove and baseboard so I could install new vinyl floor-installed floor and trimmed most of room-put frig/stove back into position.

pictures


  